01The challenge
Body-shop and dock commitments are slipping because exceptions are spotted too late, after the current shift has already lost time.
Stop selling a 40-slide OTIF deck. Show why six of eleven orders can be recovered before the shift ends.

01 / The situation behind the metric
01The challenge
Body-shop and dock commitments are slipping because exceptions are spotted too late, after the current shift has already lost time.
02The approach
Connect order risk, material readiness and workforce capacity in one operational view so the team can act in-shift instead of reacting after the miss.
03The outcome
Production, logistics and scheduling teams see the same recovery path and can protect OTIF before the missed dock becomes a larger loss.
02 / How it works
Each step adds context to the decision, so the team acts on the same picture.
All use casesReview the orders most exposed to missed dock timing and the operational constraints behind each one.
Match the order to material readiness, crew coverage and downstream handoff timing in one view.
Agree the specific actions needed before the shift closes and show the team what changes next.
03 / Keep exploring
Automotive
Share your baseline and your target. We will show how the same approach applies to your operation.